Sizing the service for a charging site
Put eight 360 kW chargers on one site and the nameplate reads 2,880 kW. Nobody builds a 2.9 MW service for that, and nobody should. The vehicles never ask for it. The useful question is how much they do ask for, when, and what happens when the service is smaller.
Section 5 of the calculator answers that by running every vehicle through the same charging model the rest of the site uses, on one shared clock, and dividing the service between them each second. Every figure below comes from it: eight 360 kW stations with 375 A cables, two each of the Model 3 Long Range, Ioniq 5 and EV9, one Taycan and one Lucid Air, each charging from 10 to 80%.
Peak requested, not nameplate
Plug all eight in at once with no limit on the service, and the most the site ever asks for is 1,862 kW at the service. That is 65% of the nameplate, for two reasons.
First, no vehicle here can use a 360 kW station’s full rating. A 375 A cable holds a 400 V-class Model 3 near 138 kW, and even the Taycan peaks at 274 kW (see the 375 A problem). Second, the peaks do not line up: each car reaches its peak at a different state of charge and then tapers.
That figure is what the calculator calls peak requested: the service the site would need for nothing to be shed. It is the headline planning number, and it is deliberately not peak delivered, which can never exceed whatever limit you set and so tells you nothing about what the vehicles wanted.
Arrivals matter more than cabinets
Space the same eight arrivals ten minutes apart and peak requested falls to 695 kW. Every vehicle still charges exactly as fast as it would alone. It just no longer overlaps much with the others. At five-minute spacing the peak is 951 kW.
This is the biggest lever on the page, and also the least controllable. Drivers do not arrive on a schedule, fleet depots sometimes can, and a highway site at 5 pm on a holiday behaves like the all-at-once case. The calculator’s stagger switch shows the range between the two, which is the honest answer: the service a site needs depends on when people show up, and cabinets alone do not tell you that.
A smaller service, shared
Now give the site a real service: 480 V three-phase on a 1,200 A breaker at a 0.98 power factor, which is 782 kW continuous after the 80% rule (the arithmetic is in Root three and the 80% rule). All eight arrive together and ask for up to 1,862 kW, so something has to give.
How it gives depends on the sharing rule:
| Sharing | Average session | Slowest session |
|---|---|---|
| No limit (reference) | 22 min | 27 min |
| Equal | 39 min | 45 min |
| Proportional | 40 min | 45 min |
| Priority (two cars first) | 37 min | 44 min |
With everyone arriving together, the slowest session is also when the site is done.
Equal splits the service evenly, and a station that asks for less than its share leaves the rest for the others. Proportional gives everyone the same fraction of what they asked for, so a big cabinet feeding a fast car gives up the most kilowatts. Priority serves tier 1 in full first; here the two Model 3s finish in their standalone 27 minutes and everyone else waits longer.
The energy is the same in every row: 498 kWh into the packs, 529 kWh from the service. A limit does not change what the vehicles need, only how long they take to get it. And it costs less time than the ratio suggests. The service is 42% of peak requested, but the average session takes 1.8 times as long, not 2.4, because once the fast cars reach their taper they ask for less and the others get more.
A per-station cap
An energy management system can cap every station, say at 150 kW. On this site that does not make anything finish sooner, because the 782 kW service binds first. What it does is make the demand predictable. With a 150 kW cap, the most the eight stations can ever ask for is 1,251 kW at the service, whatever arrives. A cap turns “it depends who shows up” into a number you can design to, at the cost of the fastest cars’ speed.
What a site battery buys
Add a battery behind the service. It discharges only for energy above the service limit, so the grid is always used first, and it can refill from whatever the stations leave unused.
| Battery | Slowest session | From the battery |
|---|---|---|
| None | 45 min | — |
| 500 kWh, 250 kW output | 36 min | 115 kWh |
| 2,000 kWh, 250 kW output | 36 min | 115 kWh |
| 250 kWh, 500 kW output | 30 min | 179 kWh |
| 1,000 kWh, 500 kW output | 30 min | 179 kWh |
For one wave of arrivals, output decides everything and capacity decides nothing. Quadrupling the 250 kW battery changes no figure; doubling its output takes six minutes off the slowest session. The service stays at 782 kW throughout.
That flips once arrivals keep coming. A busy afternoon of repeated waves drains the battery, and then capacity and the recharge rate between waves decide whether it is still there for the next one. The calculator reports the time the battery spent at its reserve floor while stations wanted more, which is the sign that capacity, not output, has become the limit. It is the same trade-off that a battery-buffered station makes, at site scale.
What this is not
Peak requested is where an electrical design starts, not the design. The site model has no voltage drop, no transformer thermal limits, no auxiliary loads such as cooling and lighting, no solar and no limits that change through the day. The vehicle curves are approximations, and real arrivals are neither all-at-once nor evenly spaced. Put your own fleet and arrival pattern into section 5, read the peak requested, and take that number to the people who design the service.
Next
Weighing a mobile charging trailer